    Quote Originally Posted by VeeWee
    Any chance of a Super Ule Rail getting milled out for the whole gun guys?
    I'd love to do that, and if I were still working the day job and had money coming in, I would, but right now, I gotta focus on paying work, and keeping it rolling, or I'm not gonna have a shop for the tools to live in.

    That's just how it is. It sucks, I know, but I'm not gonna lie to you guys and tell you I'll get to them shortly, because I won't be able to.

    If I can get a leg up long enough to do them without causing any trouble, and it appears in a time table not too far removed from delivery of the guns to you guys, I'll do them and send them along, but I'm not going to hold the project up waiting on them, because the wait could be very long.

    I'd rather actually deliver 95% of what I promised, rather than make you guys continue to wait for perfection.

    Like my old man told me when I was learning to fish, "Sometimes, you just gotta know when you cut the line and move on."

    We're at that point with this project.

    Better that you all get functional and beautiful markers that are somewhat heavier than advertised right now, instead of making more promises and extending the due date again (and again, and again, and again).

    I've learned my lesson on this one, and now that we're within striking distance of the finish line, I'm not altering course any more than absolutely necessary.

    I hope you guys will understand.

    You all have been the best customers in the entirety of paintball (and I mean that literally) about this whole project, and I'd very much like for you to come out of it not feeling like the wait was totally wasted (like the Devilmag and GForce guys have).

    I was shooting for perfection, but circumstances are closing in around me in such a manner that if I can finish this deal soon at 95%, I'd better do it, 'cause it may be the last window to do so that I get.


  2. #1472
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Decided to work on a few more things around the house,.. the Ripper was on the list yet again

    Not all exciting news,.. but I was able to complete the micro switches on all 25 wire harnesses.




    That little baggy contains the 8 wire harnesses with switches and solenoids installed. Just wanted to show you that they were not the same bunch of components

    Moving on,.....
    _______________________
    Jai "P8ntbal4me" Menard

  3. #1473
    Dend78 is offline Si Vis Pacem, Para Bellum Feedback Score 1 (100%)
    Join Date
    Oct 2004
    Location
    Indiana
    Posts
    2,963
    Quote Originally Posted by p8ntbal4me
    UPDATE

    Decided to work on a few more things around the house,.. the Ripper was on the list yet again

    Not all exciting news,.. but I was able to complete the micro switches on all 25 wire harnesses.




    That little baggy contains the 8 wire harnesses with switches and solenoids installed. Just wanted to show you that they were not the same bunch of components

    Moving on,.....
    nice looking good

    2k2 Angel LCD
    turbo trigger
    CP volumizer
    PIPE KIT

    2k Angel CnC LCD
    Vert Frame
    Freak Barrel

    B2k x-milled
    micro rock
    Dye sticky 3's
    vertical max-flo
    Edge barrel with blue J&J tip

    Egg 2 y board
    Empire Reloader
    Dye Throttle 91/4500
    Crossfire 114ci/3000
    Angel Air Reg

  4. #1474
    Join Date
    Jan 2003
    Location
    Missouri
    Posts
    3,770
    You can't see it, but right now I'm doing the "Happy Snoopy Dance".


  5. #1475
    Join Date
    Dec 2004
    Location
    Jeet yet ?
    Posts
    8,132

    Talking

    Quote Originally Posted by CoolHand
    You can't see it, but right now I'm doing the "Happy Snoopy Dance".










  6. #1476
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Here is what I did today:

    I completed 15 harnesses with solenoids
    I completed 21 harnesses with battery snaps
    I completed 21 harnesses with capacitors

    Here's a photo for proof



    The baggy in the upper right contains the remaining harnesses without battery snaps and capacitors.

    Im trying to make as much headway on this before things go south. I feel the need for a break like I said,.. but I get motivated in the morning and I end up working on this when I say I wont that day

    Either way,.. were getting there!

    Moving on,...

    ~ P8nt


  7. #1477
    Join Date
    Sep 2006
    Location
    Eyes for your EMAG? Oh yes! PM me for an ACE board. Replacement Xmag ACE boards too!
    Posts
    1,532
    Looking good!

  8. #1478
    Join Date
    Apr 2006
    Location
    Don' ask questions. It is considered "trolling" in some locations.
    Posts
    4,266
    Your counter tops are nice.

  9. #1479
    Join Date
    Dec 2004
    Location
    Jeet yet ?
    Posts
    8,132

    Talking

    post # 1475 .... dittos



  10. #1480
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by MANN
    Your counter tops are nice.

    Thanks! They are new (3 months).

    ~ P8nt


  11. #1481
    Join Date
    Sep 2006
    Location
    Eyes for your EMAG? Oh yes! PM me for an ACE board. Replacement Xmag ACE boards too!
    Posts
    1,532
    Quote Originally Posted by p8ntbal4me
    Thanks! They are new (3 months).
    ~$40/sq. ft.?

  12. #1482
    Join Date
    Apr 2006
    Location
    Don' ask questions. It is considered "trolling" in some locations.
    Posts
    4,266
    Quote Originally Posted by Papa_Smurf
    ~$40/sq. ft.?
    I bet it was closer to 60-70 range

  13. #1483
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by MANN
    I bet it was closer to 60-70 range
    I put the receipts away just this past week,.. let me dig them up and I will let you know.

    I don't think it was that much though,....

    ~ P8nt


  14. #1484
    Join Date
    Sep 2006
    Location
    Eyes for your EMAG? Oh yes! PM me for an ACE board. Replacement Xmag ACE boards too!
    Posts
    1,532
    Quote Originally Posted by p8ntbal4me
    I put the receipts away just this past week,.. let me dig them up and I will let you know.

    I don't think it was that much though,....

    ~ P8nt

    My cost is usually 15-30, so I can set some for 40-42/ft, but the ritzy stuff can be 90 and up.

  15. #1485
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE;

    Well I took my vacation this past 2 weeks (still on the last days)

    I had my daughters baptism yesterday, and 40 people in my apartment,... so it was A LOT to handle over the past 2 weeks!

    I should be getting back to work on this Monday of next week (18th). Just wanted to pop in here and give a "hey i havent run off yet"

    ~ P8nt


  16. #1486
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE:

    Monday looks to be a shot day as well. Its a holiday,... so no sitter for my daughter.

    She is sick again with the sniffles and such,... hoping we are at the ernd of that right now.

    I will know better Tuesday when I get back into my routine.

    ~ P8nt


  17. #1487
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE:

    I did some work on the upper boards today.

    Dont get excited,.. it was only 6 harnesses





    I have to solder the switch and LED on those,....

    My daughter is getting better. But I end up spending most of the night checking her and get ZERO sleep.

    This is dragging,.. and Im sorry guys.

    Hoping to make some head way Friday night when the house is empty.

    ~ P8nt


  18. #1488
    Dend78 is offline Si Vis Pacem, Para Bellum Feedback Score 1 (100%)
    Join Date
    Oct 2004
    Location
    Indiana
    Posts
    2,963
    hey thats 6 more than you had keep it up man


  19. #1489
    Join Date
    Jan 2003
    Location
    Missouri
    Posts
    3,770
    Any progress at all is better than none.


  20. #1490
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE:

    I had some time to work on the wire harnesses tonight.



    I finished wiring up all the leads that solder directly to the upper daughter board.

    Only thing left on the daughter boards are the power switches and the LEDs.

    List of things that have been done:

    I completed 15 harnesses with solenoids
    I completed 15 harnesses with daughter boards
    I completed 21 harnesses with battery snaps
    I completed 21 harnesses with capacitors


    ~ P8nt

    Last edited by p8ntbal4me; 01-22-2010 at 09:15 PM.

  21. #1491
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE:

    I had a few minutes to work on the Ripper stuff





    These 5 harnesses have the power switches installed now.

    I plan to finish the switches first, then finish the LEDs.

    After that,.... we can move on to building frames!

    List of things that have been done:

    I completed 00 harnesses with LEDs
    I completed 05 harnesses with power switches
    I completed 15 harnesses with solenoids
    I completed 15 harnesses with daughter boards
    I completed 21 harnesses with battery snaps
    I completed 21 harnesses with capacitors

    ~ P8nt


  22. #1492
    Join Date
    Dec 2004
    Location
    Jeet yet ?
    Posts
    8,132

    Smile

    Thanks for the update.


  23. #1493
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Hey guys,.. I wanted to talk to all of you that are committed in the pre-order for a moment.

    With the time line I have to work on these frames to get them into your hands and finish the project, I have asked Ryan to change some of the details set forth by myself since I have joined the team to complete the Ripper Frames.

    What I have figured is that in order to get these harnesses and board done 100% soon, I need to think about how much time I have before I go back to work full time.

    With that said, I have asked Ryan to allow me to omit the connectors that I wanted to crimp on the ends of the wires for the eyes and warp feed connections.

    Of course, these wires will be 100% working when you receive your frame. Just that they wont have the connectors installed on them.

    I know I said I would do them, and I truly am sorry for taking the commitment back. I just did some planning and looked at the work left, and figured another 6 months of updates was going to be un-acceptable for me.

    I hope you all understand where Im coming from. If I could hold these frames up any longer,.... you would have what I offered. But holding them up for a few wires is just not acceptable anymore. Im sure you all can agree on that much.

    Maybe when things slow down again for me in the off season I can help you all get some hookups going.

    Again,... Im very sorry.

    ~ P8nt


  24. #1494
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    I did some more work on the Ripper project today.

    Here is a picture of 15 harnesses with power switches on the upper boards



    Here, I decided to bang out 6 more boards with switches to make the total of upper boards with power switches to 20.



    From here,.. the last thing (and the hardest) is to modify the LEDs to mount to the upper board. This takes some time. So the progress will be slow per harness. After the LED is on, I am pretty much done!

    List of things that have been done:

    I completed 00 harnesses with LEDs
    I completed 15 harnesses with power switches
    I completed 15 harnesses with solenoids
    I completed 15 harnesses with daughter boards
    I completed 21 harnesses with battery snaps
    I completed 21 harnesses with capacitors

    ~ P8nt


  25. #1495
    Join Date
    Sep 2006
    Location
    Eyes for your EMAG? Oh yes! PM me for an ACE board. Replacement Xmag ACE boards too!
    Posts
    1,532
    Rockin' man.



  26. #1496
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Well the day has come,.. I am finished some wire harnesses!

    Here is a nice shot of 10 that are 100% ready to go (yes,.. I tested all of them )



    My hands are killing me right now,.. not to mention Ive been glued to this chair for more than 4 hours now.

    Im going to touch base with Ryan on the next steps taken and we will be on our way!

    List of things that have been done:

    I completed 10 harnesses with LEDs
    I completed 15 harnesses with power switches
    I completed 15 harnesses with solenoids
    I completed 15 harnesses with daughter boards
    I completed 21 harnesses with battery snaps
    I completed 21 harnesses with capacitors

    ~ P8nt


  27. #1497
    Join Date
    Jan 2003
    Location
    Missouri
    Posts
    3,770
    Huzzah!!!



    I've got all your emails, and they're marked so I won't forget to reply to them.

    I just got back from the shop, and I'm wiped. Don't expect a reply until later on tonight.

    They look real good man, very glad to see everything is going to plan (more or less).

    I really appreciate your help on this project, and I'm sure that's not a unique sentiment amongst those who have been waiting.


  28. #1498
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    I finished the last 5 harnesses for LEDs today.



    Im going to work on the battery snaps and capacitors today for as long as I can stand it.

    Tomorrow is looking shot for working on the Ripper Project. But at this point we are in a VERY good position!

    List of things that have been done:

    I completed 15 harnesses with LEDs
    I completed 15 harnesses with power switches
    I completed 15 harnesses with solenoids
    I completed 15 harnesses with daughter boards
    Pre-Order electronics are good to go

    I completed 21 harnesses with battery snaps
    I completed 21 harnesses with capacitors

  29. #1499
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Another progress photo



    The 10 harnesses pictured are the ones beyond those 15 needed for the pre-order.

    The 8 on the left are complete with battery snaps and capacitors.

    The 2 on the right are complete with battery snaps, capacitors, power switches, and upper boards

    List of things that have been done:

    Pre-Order electronics are good to go

    I completed 15 harnesses with LEDs
    I completed 17 harnesses with power switches
    I completed 15 harnesses with solenoids
    I completed 17 harnesses with daughter boards
    All harnesses have battery snaps
    All harnesses have capacitors


    ~ P8nt


  30. #1500
    Join Date
    Jan 2003
    Location
    Missouri
    Posts
    3,770
    Home stretch!

    Go man, GO!




Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •