Yeah, but we'll have to mod it a bit to stay in place without a twistlock. I'd bet we could do that with a well placed set screw though.Originally Posted by BigEvil
Yeah, but we'll have to mod it a bit to stay in place without a twistlock. I'd bet we could do that with a well placed set screw though.Originally Posted by BigEvil
Ryan Shanks
Logic Industries LLC
Sounds good to me. Mostly llooking to see how the lpr sits and things like that.Originally Posted by CoolHand
even if you have to use the usual eclipse covers or what not.Originally Posted by CoolHand
do you have an estimated time period for delivery after the pre-order fills? I'd like to be in action by october but don't mind waiting.
The machine work has already started, so I'd say 12-14 weeks to start shipping the preorders.Originally Posted by MadPSIence
If more than 25 sell, there will be another 6-8 week lag for more frames to be cut and anodized.
Now that, I don't have a prototype of. I just tapped another hole into an existing AGD VA. The LPR just sticks out under the barrel like an Impulse with an LPR.Originally Posted by gothsqwd
Will this frame be more or less reliable when compared to a devil mag frame?
Well, this is question loaded with danger.Originally Posted by Conversekidz
If I say yes, then I'm bagging on GADevil's product.
If I say no, then I'm shooting myself in the foot.
I'll put it like this:
The LPR is a set it and forget it kind of deal. It will come preset from me, and should never have to be fiddled with. The solenoid valve is rated for upwards of 200 million cycles (200,000,000+ cycles), and the board is made by TAG/KM2 arguably the makers of the most reliable boards in the world.
So here is the bottom line: These frames will be rock solid. I can't draw a comparison with the DM, but I can tell you that the parts I have used are very reliable, and they are being used in the manner which they were designed to be used (IE, I'm using them for what they are meant for). That all goes a very long way to making these frames basically bullet proof.
I will say you will have about 50 times more trouble with the LVL X than you will ever have with these frames (provided, of course, that you don't take them apart and fiddle with everything all the time).
That's about all I can say on that, I think.
But that takes all the fun out of it.Originally Posted by CoolHand
If it could work with one of Doc's adaptors via a set screw, what would be the estimated installation cost?
Hey, look at that! It's Santa!
http://devilsden.tv/DM-pics.htm
If I ordered one I would want you to do the eye work for me as well. Take a look at the compound eyes from GA Devil's website. These look better and are more reliable than the eye covers made for mags. Let me know if you can do it.
Dust Green X-Mag #315
ULE body w/ dual Kila V2 detents, X valve w/ LX, Y-grip w/ Dye grips, ULT, Omega rail, Stainless Steel Freak Kit.
My Feedback- https://www.automags.org/forums/showthread.php?t=165428
Sorry if I missed this info, but I have a question. I know you said 12-14 weeks (if everything goes perfectly) for the pre-orders, but any idea when we will get to see the prototype in action?Originally Posted by CoolHand
*crosses fingers his cocker sells so he can get one.*
I haven't played with a mag in a long time, this would definately replace my proto.
well i say promise the 15 batch quick. people don't wanna pay early then get sucker punched another 6-8 weeks for the late buyers. Let the late ones wait..Originally Posted by CoolHand
anyways, do you have a number I could give you a shout at. I'm interested but need to iron some stuff out and communication via internet is slower than a cocker.
Well yes, that should go without saying.Originally Posted by MadPSIence
I meant, that any orders after 25 will have to wait while more frames are cut, not that everyone would have to wait.
I am in the process of working up some aluminum covers, that are a little less agricultural looking than the compound. If worse comes to worse, I will go with the epoxy, but I really don't like it.Originally Posted by Skywalker
Its looking like there is no way for me to get around doing eye installs . . . . . . .
Well, the proof of concept marker was built, tested, and torn down about seven months ago.Originally Posted by armyboot
I can take some pics of the system in a vert frame (the test mule), but I'm afraid that you are going to have to hang on until I get some of the new parts in. There will be a month at least to make videos and such once the parts are machined, while everyone else's stuff is at ano.
So, I'd say videos and such in about six weeks.
Best I can do.
For just that mod?Originally Posted by WenULiVeUdiE
Maybe $25-$30 (if its that simple).
Sounds good to me! Can't wait to see what this awesome mod will do.Originally Posted by CoolHand
I think I'm gonna have to lower the price on my cocker... I really want a mag again
Where does the LPR hose get routed into the frame?
Jason
From page one:Originally Posted by RFLMN1
There ya go.Originally Posted by CoolHand
Thanks, Ill pay better attention next time. Now I just need to sell some things to get one.
Jason
Originally Posted by RFLMN1
No worries, I was just too lazy to retype it.
I just wanted to know who you would recomend to have the milling for the eyes done by. I have a Karta Emag and as soon as I can put the money together I will be ordering one of these bad boys. Thanks .
TAG, or Destructive Customs I believe could do it.Originally Posted by stonersr26
Yup.Originally Posted by MadPSIence
DC, JMJ, TAG, or any number of other airsmiths can do it.
The question is whether they want to do it or not.
IIRC Chris (GADevil) does the Mag stuff at TAG, and he is obviously buried. I don't know if they take any more or not.
DC could certainly do it (they are quite capable machinists), but once again, I don't know if they have done any Mags in the past, or if they want to do any now. They do a lot of machine work on Vikings and the like, which I imagine is much more profitable (and less labor intensive) than this sort of thing.
Like I said before, let me check around and see what houses I can line up.
When I get a list populated, I will post it here.
Thanks, that will be very helpfull
DC is familiar with AGD stuff.. they should be able to get r' done. just give them a shout, toss an email. They are great for replying fast.
ryan have you figured out if you can get a full gun together yet? for the body i'd probably have you send it out to DC first, then back to yourself for assembly.. then send it to me. rather than myself having to send 2 international packagages, and receive 2. that's retarded money.
little known fact we started with AGD (and never really left)
we are the only AGD dealer left in new england that I know of
Last edited by magmonkey; 07-17-2005 at 02:06 PM.
right from the horses mouth. hey are you guys getting your excalibur milling patterns out soon? I'm gettin ready to just sell mine and go mag.Originally Posted by magmonkey
That's good to hear.Originally Posted by magmonkey
I just talked with Luke as well, so the list is growing.
And I don't have a problem doing the assembly, I'm just not going to be able to do all the installs and the machine work, and new design, and shipping, and . . . . . . . . . . . . . . .
all I'd ask is you put the frame onto a body/rail, stick detents and a feedneck on it and send it to me ready to gas and fire..Originally Posted by CoolHand
i may just use a level X instead of eyes.
does that sound do-able?
Well yeah, I can sell you a whole marker, or assemble one from parts you send, that is certainly doable (eyes or not).Originally Posted by MadPSIence
The only thing that would stop us is AGD being out of what you want, but with 6- 12 weeks before the parts are all done, I'm sure we can get it all found in time though.