Page 12 of 30 FirstFirst ... 2891011121314151622 ... LastLast
Results 331 to 360 of 893

Thread: New E-Mag/X-Mag board!!!!!!

  1. #331
    Join Date
    Mar 2005
    Location
    Milwaukee, WI
    Posts
    191
    Quote Originally Posted by p8ntbal4me
    We have been working on this.
    but it won't be ready for tunaball 6
    Any other things your working on?

  2. #332
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by TheePsycho
    Any other things your working on?
    2 jobs to help pay the balance of the labor for the board house off so we can make some new E/X-Mag Boards

    I havent seen one new buyer in over a month,... so unless someone comes along with a nice wad of cash,... we have hit a delay here folks!
    _______________________
    Jai "P8ntbal4me" Menard

  3. #333
    Join Date
    Jan 2012
    Location
    Near Frankfurt, Germany
    Posts
    166
    How many Boards left to be sold so that these Boards can finally get into production?

  4. #334
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by RST
    How many Boards left to be sold so that these Boards can finally get into production?

    31

    Only thing left is the balance of the labor to pay the board house.

    Parts are all here ready to go.

    The board house has the boards now printed.

    We need to pay for the labor, thats it.

  5. #335
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    The ACE boards are done.

    The frame and battery pack should be here this week.

    I got a hold of an RF kit to test with the new board.


    UPDATE ON THE SURPRISE PRODUCT #1 FOR TUNABALL 6

    This should be ready to install in the new test gun on time.
    You guys will be really happy with what we have to show you,.....

    UPDATE ON THE SURPRISE PRODUCT #2 FOR TUNABALL 6

    We will have this one ready for show, not for testing.
    The issue is with the code. I would like to have it installed in something so someone can put it through the ringer, but with the code being so complex, we wont have time to develop something to use on the field.

    At least you guys will see what we are planning to do.


    UPDATE ON THE PRODUCTION PROGRESS

    RST asked where we are at with the production completion level, so I will answer that here.

    Parts are waiting here in my shop. All ready to be installed.
    Boards have been printed and are ready to have the parts installed on them.
    The last balance remaining is the labor cost to put the parts on the boards.

    Im working another job to help speed the process up, but we need to get more buyers on board as well.

    So thats where we are at.

  6. #336
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE ON THE ACE BOARD

    We got the new ACE boards all soldered up ready to go.

    The frame and battery should be here Tuesday to test.

    I still have to build a wire harness for the ACE board, should have that done next week as well.

    We will have the X-Mag I have been testing the new board in ready to go with the new upper board.

    UPDATE ON THE SOFTWARE

    We have been making some changes to the software to improve some key features.
    The eye logic is vastly more accurate when it comes to seeing the ball before it is fully in the breach.
    The ball can now be picked up by the sensor before the ball hits the bottom of the breach.
    If the ball triggers the fire cycle and then bounces up off the bottom of the breach because of a loader mis-feed behind the loaded ball, a non-force feeding loader being used, etc. The software can accommodate a new setting to counter the delay, which ultimately helps prevent the first ball from being chopped in the breach.

    We deleted a few tourney preset modes and made new ones so that you can "program" them to be whatever you wanted. In other words, there would be no reason to send your board back to have the software upgraded to fit a tourneys new rules for ROF limits changing. You simply now can save new settings into the register banks as you want them to function for whatever rules you have to work around in said venue.

  7. #337
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE ON THE ACE BOARD

    Here is a picture of it being assembled.

    Only thing missing is the plastic cover over it (which we will now manufacture for you!)



    Keep in mind this design layout has changed. The connectors will be turned to accommodate the new wire harness in a more simplified fit.

    This is the board we will test out at Tunaball 6.

    For those of you waiting to get the ACE, it will be shipping with your new E/X-Mag Board!

  8. #338
    Join Date
    Nov 2010
    Location
    East Coast
    Posts
    498
    Exciting stuff, What is everybody waiting for put something the down!

    Thanks for all the updates paint, your doing it how it should be done with pre-purhases.

    +1 on ace board

  9. #339
    Join Date
    Jun 2009
    Location
    Kentucky
    Posts
    4,144
    Quote Originally Posted by p8ntbal4me
    and made new ones so that you can "program" them to be whatever you wanted
    Tiger Blood!!!

  10. #340
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE ON THE MAIN BOARD

    We received the main board back from the software engineer today.
    Everything is working fine!

    The software is even faster now,.. fire cycles are very quick!

    And the eye logic,.... wow. Just amazing! Its picking up the eye being dirty, missing a ball, it resets itself when the breach is cleaned out,.... its everything you guys will want and then some!

    We need to put the gun back together and its ready for Tunaball 6!

    UPDATE ON THE MAIN BOARD - AUX PORT FUNCTION

    We have installed an RF module in a Loader and in the gun plugged into the Aux port on the new board. It works friggen awesome!

    Here is a video:
    <iframe width="420" height="315" src="http://www.youtube.com/embed/BZqp8hWWhFQ" frameborder="0" allowfullscreen></iframe>


    UPDATE ON THE ACE

    We have finished the ACE. Its testing now and everything is working.
    Once we put the gun back together I will shoot a video of it working with paint.

    UPDATE ON THE SURPRISE PRODUCT #1 FOR TUNABALL

    We have decided to change 2 things on this little bad boy.
    Not that you guys know what we are doing or what we changed, but its almost complete.
    We tested the design against the new main board today and what a difference the software is making!

    You guys are going to LOVE this product!!!!!!

  11. #341
    Join Date
    Jul 2005
    Location
    Denton, TX
    Posts
    202
    Wow... Im gonna hold onto the money i have left to buy one of these at release...

  12. #342
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    I have made the videos of the new software running on the board,... waiting for youtube to finish editing.

  13. #343
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE ON THE MAIN BOARD - VIDEO

    Here is the first video
    Paint used was from Reaperball last year in September. Same paint used in the original test video. The temperature was 78 degrees in the sun.

    The body is a MicroMag 2009 vert breach (this is the FIRST time I have ever used this body - I have two of them), cocker barrel, fresh battery

    The loader is an EMPIRE B2 with a Virtue board and RF module installed.
    The gun has the other RF module plugged into the AUX port on the board.

    The board was set on 18bps Full Auto (I shoot with my left hand and I had no camera man)

    <iframe width="420" height="315" src="http://www.youtube.com/embed/TUBRY-3KT4c" frameborder="0" allowfullscreen></iframe>

    Second video
    Changed out the barrel, left the paint in the breach
    Same settings on the gun.

    <iframe width="420" height="315" src="http://www.youtube.com/embed/XUkzBQ1nO9w" frameborder="0" allowfullscreen></iframe>

  14. #344
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE ON THE MAIN BOARD - MORE VIDEO VIDEO

    I was told that the MM2K9 body was prone to chopping balls for whatever reason.

    I decided to dig out some more random parts and piece together another test mag.

    This time I went with an AGD ULE body and an AGD E-Mag rail.

    It was 85 degrees out, no wind, sunny, and the paint was the same stuff.

    Not a SINGLE ball chop this time with a solid string of paint from start to finish.

    <iframe width="420" height="315" src="http://www.youtube.com/embed/KDKE-JE1wt8" frameborder="0" allowfullscreen></iframe>
    I think at this point I would really like to thank the guys whom have pre-paid.

    You all have had a lot of patience and I have not have one single complaint.
    If we could get the rest of the guys that jumped on the pre-order in the beginning to pay their amounts, we could close this thing up in 2 weeks time.

    Everyone is doing great and keep the faith!
    For those of you traveling to Tunaball 6, you will have a chance to shoot the board on the field.

    ~ P8nt
    Last edited by p8ntbal4me; 04-16-2012 at 11:32 AM. Reason: adding video

  15. #345
    Join Date
    Oct 2010
    Location
    Troy, NY
    Posts
    223
    Looks awesome, can't wait for it to be completed!!!

    Also for my order I'm planning on adding the warp feed cable (warp sits on the left side of the gun)

    Also, I saw this once on this forum where someone had the emag battery powering both the warpfeed and the board on the gun. Is there anyway you will be able to make a wire that is able to do this?
    I know it'll drain the battery faster obviously but I don't know how it'll effect the overall lifespan of the battery. A main reason why I'm asking is to save weight.

    -Rob

  16. #346
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by robander3
    Looks awesome, can't wait for it to be completed!!!

    Also for my order I'm planning on adding the warp feed cable (warp sits on the left side of the gun)

    Also, I saw this once on this forum where someone had the emag battery powering both the warpfeed and the board on the gun. Is there anyway you will be able to make a wire that is able to do this?
    I know it'll drain the battery faster obviously but I don't know how it'll effect the overall lifespan of the battery. A main reason why I'm asking is to save weight.

    -Rob
    I could cook you up a cable like that.

    Shouldnt be that hard.

    Only thing is I would caution you to do ANYTHING beyond the cable we make for you.
    Reason being is the warranty on the board.

    Tell you what, let me wire one up to the new board after Tunaball 6 and see what will happen to the board. That way I could put some kind of warranty on the cable as well.

    Remind me to do this after May 5th!!!!!

  17. #347
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    PanzerGen

    I have received your deposit


    UPDATE

    I have just about everything ready for Tunaball 6.

    Ive been shooting some left over paint out the X-Mag to test the ACE,... we have to get on making some new eye modules for the ACE customers.

  18. #348
    Join Date
    Feb 2005
    Location
    Texas
    Posts
    9,318
    Need-moar-board-vids

  19. #349
    Join Date
    Dec 2006
    Location
    SoCal
    Posts
    2,245
    Quote Originally Posted by BigEvil
    Need-moar-board-vids
    You'll probably be starring in one soon...

  20. #350
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by zondo
    You'll probably be starring in one soon...


  21. #351
    Join Date
    Feb 2005
    Location
    Texas
    Posts
    9,318
    Quote Originally Posted by zondo
    You'll probably be starring in one soon...
    OH YEAH!?!?! MY mother always said I have a face made for radio.

  22. #352
    Join Date
    Dec 2006
    Location
    SoCal
    Posts
    2,245
    Quote Originally Posted by BigEvil
    OH YEAH!?!?! MY mother always said I have a face made for radio.
    That's why you'll be wearing a mask when you shoot it. You thought it was for safety.... pffffffft!

  23. #353
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Videos are made.

    I cant upload them yet though

    There are some secret products in the video that I want to wait till Tunaball 6 to show off.

    Main board, ACE, and software are in 100% working order.

    This thread will be updated Saturday night/Sunday morning

  24. #354
    Join Date
    Oct 2005
    Posts
    48

    IT's Saterday

    Taping my feet waiting for videos.

    http://www.youtube.com/watch?v=vRSUg4WxpiM



  25. #355
    Join Date
    Oct 2010
    Location
    Troy, NY
    Posts
    223
    Quote Originally Posted by p8ntbal4me
    I could cook you up a cable like that.

    Shouldnt be that hard.

    Only thing is I would caution you to do ANYTHING beyond the cable we make for you.
    Reason being is the warranty on the board.

    Tell you what, let me wire one up to the new board after Tunaball 6 and see what will happen to the board. That way I could put some kind of warranty on the cable as well.

    Remind me to do this after May 5th!!!!!
    Reminding you of the warp feed emag battery power supply possible mod.

  26. #356
    Join Date
    Feb 2005
    Location
    Texas
    Posts
    9,318
    We got to see the new board in action this weekend at Tunaball 6. Holy Crap.

  27. #357
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Here it is,...... the secret product for the new main board.

    Break Beam eyes for your AGD X-Mag!

    <iframe width="420" height="315" src="http://www.youtube.com/embed/rfhsE_E8HOc" frameborder="0" allowfullscreen></iframe>

  28. #358
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    UPDATE

    Here is a video explaining how the new ACE and Break Beam boards will no longer use the wire gromit in the X-Mag to get power to the main board.

    <iframe width="420" height="315" src="http://www.youtube.com/embed/QY3xJ1NrQD4" frameborder="0" allowfullscreen></iframe>

  29. #359
    Join Date
    Aug 2003
    Location
    www.BigEvilOnline.com
    Posts
    2,580
    Quote Originally Posted by promethion
    Taping my feet waiting for videos.

    http://www.youtube.com/watch?v=vRSUg4WxpiM



    We didnt get a video of me using the board in a game

    Redic did get a ton of photos of me ripping some guys apart with it.

    The board functions better than as we expected!

    I will re-make a video this weekend and post it up.

    This time I will have the ACE board running with paint!

    I ran the main board saturday with an RF installed too,.... its very fast! The main board would pulse the loader without a problem!

  30. #360
    Join Date
    Apr 2010
    Location
    SODAK
    Posts
    4,809
    break beam huh. ooooohh how nice is that. man now i have to get both.

    what milling needs to be done for preakbeam to work?
    who does it?

    getting the cash ready. i have two new emag frames coming to me. so i will for sure need two .

    yippy.

  31. 05-09-2012, 04:49 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •