Logic Ripper EM - The Electro Solution - PreOrder

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • zazzoo
    Registered User

    • Jan 2005
    • 843

    #1231
    Originally posted by wooky
    CoolHand I am just checking in, I suppose all these babies are still spoken for? I still have cash for anyones spot!!


    JLMK
    Wook
    Same here are there still gonna be extra frames available I know i talked to you about it before but I forgot what you had told me
    feedback
    http://www.pbnation.com/showthread.php?s=&threadid=848340

    http://feedback.ebay.com/ws/eBayISAPI.dll?ViewFeedback&userid=davidsimpson&item=-1&frompage=222

    Comment

    • CoolHand
      Logic Industries LLC
      • Jan 2003
      • 3769

      #1232
      Originally posted by zazzoo
      Same here are there still gonna be extra frames available I know i talked to you about it before but I forgot what you had told me
      I have ten (10) more kits to sell when this is all done.

      First come, first served, until they are gone.

      They'll be sold as semi-finished kits only though. I don't want to deal with another huge **** storm like this again.
      Ryan Shanks
      Logic Industries LLC

      Comment

      • zazzoo
        Registered User

        • Jan 2005
        • 843

        #1233
        Originally posted by CoolHand
        I have ten (10) more kits to sell when this is all done.

        First come, first served, until they are gone.

        They'll be sold as semi-finished kits only though. I don't want to deal with another huge **** storm like this again.
        very understandable I'll keep checking to see when this gets done but if you would shoot me a pm when its all over with I would like a shot at one of the 10
        goodluck on finishing these up
        feedback
        http://www.pbnation.com/showthread.php?s=&threadid=848340

        http://feedback.ebay.com/ws/eBayISAPI.dll?ViewFeedback&userid=davidsimpson&item=-1&frompage=222

        Comment

        • joelbird
          forever lurking
          • Dec 2006
          • 193

          #1234
          Originally posted by CoolHand
          I have ten (10) more kits to sell when this is all done.

          First come, first served, until they are gone.

          They'll be sold as semi-finished kits only though. I don't want to deal with another huge **** storm like this again.

          I would be interested in one of the 10 down the road when they are available. keep me posted about them

          Comment

          • CoolHand
            Logic Industries LLC
            • Jan 2003
            • 3769

            #1235
            Goldie sent me back a board that he thought he'd gotten fixed, but when I tested it, I got the same outcome as before, so I don't think we're really any better off yet.

            Sorry I don't have better news on that front.

            With the rain and crummy weather, I haven't gotten anything done out in the shop either.

            Too cold for the CNC to operate correctly, and too damned wet and soft to get more propane into the tanks either (plus it's like $2.65 a gal right now).

            Hopefully the weather will break this week or next and I can get something done.
            Ryan Shanks
            Logic Industries LLC

            Comment

            • manwe33
              Waiting 4 my LogicRipperEM
              • Jul 2006
              • 574

              #1236
              Well atleast something is happen.. I cant wait to get better weather my self. Drop a couple inchs of snow here yesterday... This weather sucks.

              Just wondering if Jared got ahold of you about the eye covers for my body. He said he would try and contact you!

              Comment

              • CoolHand
                Logic Industries LLC
                • Jan 2003
                • 3769

                #1237
                Originally posted by manwe33
                Well atleast something is happen.. I cant wait to get better weather my self. Drop a couple inchs of snow here yesterday... This weather sucks.

                Just wondering if Jared got ahold of you about the eye covers for my body. He said he would try and contact you!
                He did.

                Right now, he is waiting on me to supply him with a SuperULE rail, which I have not machined yet.

                We're on the same page though, which is more than we had two weeks ago, so that's something at least.

                Ryan Shanks
                Logic Industries LLC

                Comment

                • smilestyler
                  Ace Dentura

                  • Oct 2002
                  • 975

                  #1238
                  Did any parts go to gruntbull yet?

                  Comment

                  • manwe33
                    Waiting 4 my LogicRipperEM
                    • Jul 2006
                    • 574

                    #1239
                    Originally posted by CoolHand
                    He did.

                    Right now, he is waiting on me to supply him with a SuperULE rail, which I have not machined yet.

                    We're on the same page though, which is more than we had two weeks ago, so that's something at least.

                    Great that is prefect news!!!!!!

                    Comment

                    • CoolHand
                      Logic Industries LLC
                      • Jan 2003
                      • 3769

                      #1240
                      Originally posted by smilestyler
                      Did any parts go to gruntbull yet?
                      No, they're waiting on me to get the SuperULE rails cut.

                      I'll do my damnedest to get at least a few cut this weekend.

                      I've got the GCode done, the tools pulled and ready to load, and the bar stock waiting in the rack, I just need the weather to cooperate for a couple of days in a row.

                      The CNC machine refuses to shift the gearbox or change tools when the ambient temp is below 65-70 degs F inside the shop. Differential heating causes the tools to stick in the spindle and fault out the control. When that happens, it's a start over from the beginning kind of problem, which makes it a big problem. Assuming I can actually physically remove the stuck toolholder from the spindle, I have to do so by hand, then reset the tool changer manually, drop the umbrella down and reload the rogue toolholder, jog back to a safe zone, and restart the program from the beginning (and then hope another tool doesn't stick the second time around). Basically, it makes it impossible to get anything done.

                      Same thing with the gear box in the head. The gears and bearings get warm with use, but the casting stays pretty much at ambient when it's cold (just not enough heat generated to keep up with the loss to the surrounding air, so the temp never really rises above ambient), so the shafts bind the shifter shuttle when it tries to shift into high gear. When it's cutting alum, I only ever use high gear, BUT in order to change tools, it has to down shift into low, index the spindle to change the tool, then shift back into high and spin up the new tool. If it can't get back into high for whatever reason, it faults out and we go back to the start again. It's not as involved a restart as the tool changer fault, but it still makes me restart the program from the beginning, and once again, basically makes it impossible to get anything done.

                      Ordinarily, I'd just crank up the heater for a day or so and let things warm up real good and stay there, but I ran out of propane about two or three weeks back, and it has literally been raining here ever since. That means there's no way to get a truck into the yard and around behind the shop to fill the tanks (it'd just sink up to the axles the instant it left the gravel drive, hell, I sink up to the axles when I walk out there). Couple that with propane that is ~$2.65 a gallon and two tanks totalling 1500 gals of capacity, and add in that it's nearly summer for good measure, and you find that the heat just ain't a gonna be running for a month or two at least.

                      When it gets above 70 degs F outside for a couple of days, I can get back in there and bang out some rails. Until then, we wait.

                      Sorry, but that's just the way the cookie crumbles.
                      Ryan Shanks
                      Logic Industries LLC

                      Comment

                      • smilestyler
                        Ace Dentura

                        • Oct 2002
                        • 975

                        #1241
                        If you haven't sent to gruntbull, and you have been speaking to Jared, is it too late to get the eyes installed? I can't seem to get a hold of him.

                        Comment

                        • manwe33
                          Waiting 4 my LogicRipperEM
                          • Jul 2006
                          • 574

                          #1242
                          Originally posted by smilestyler
                          If you haven't sent to gruntbull, and you have been speaking to Jared, is it too late to get the eyes installed? I can't seem to get a hold of him.
                          From what i know Jared has a months of work ahead of him. I would guess if he has not gotten back to you it might be a little late. I sent my body over to him about 4 months ago. But you never know. Keep trying to get ahold of jared and find out. I dont think Ryan knows what Jared project load is. Jared might be able to do your body the same time he does mine. What kind of body are you Using? And what kind of rail?

                          Comment

                          • manwe33
                            Waiting 4 my LogicRipperEM
                            • Jul 2006
                            • 574

                            #1243
                            Originally posted by smilestyler
                            If you haven't sent to gruntbull, and you have been speaking to Jared, is it too late to get the eyes installed? I can't seem to get a hold of him.
                            One more thing. What part of Saskatchewan are you from. I spent some time in Regina and PA a few years ago.

                            Comment

                            • smilestyler
                              Ace Dentura

                              • Oct 2002
                              • 975

                              #1244
                              Originally posted by manwe33
                              One more thing. What part of Saskatchewan are you from. I spent some time in Regina and PA a few years ago.
                              I play with PA Predators, but I live about 80 miles away.

                              My problem is that my emails bounce back, and he never returns messages on his answering machine. I am using the superULE rail with vert ULE body.

                              Comment

                              • CoolHand
                                Logic Industries LLC
                                • Jan 2003
                                • 3769

                                #1245
                                Nothing has gone to ano yet, so you're OK there.

                                I have no better luck getting a hold of Jared than anyone else does (though my emails don't bounce outright), sometimes it's more than a week from when I send an email to when I get a response (assuming I get one).

                                The guy's just hella busy, and like me, he's a little scatter-brained on the small stuff. Keep trying, you'll catch him eventually.

                                Ryan Shanks
                                Logic Industries LLC

                                Comment

                                Working...