here's the list tom posted earlier:
Before we can even think about redesigning the Z-Grip I have to,
looks to me like they could be here by spring?
Before we can even think about redesigning the Z-Grip I have to,
- Finish the 4500
- Rework the mold on the nubbins
- Get the Superbolts into smooth production
- Design the ACE system
- Rework the Extreme bodies for the ACE
- Redesign the Warp Feed Module for the Extreme
Gun Dyno the power tube tips with the Superbolt
Get the Extreme into production
Verify the mold fixes in the Warp diverter plate and adaptors
Get the AGD store photos and descriptions done for ALL our parts and products
looks to me like they could be here by spring?

Comment