Will you be offering a pre-tapped VA? AGD does not currently offer a VA with a front port, just side ports.
G-Force to release pneumatic frames for the Mags
Collapse
X
-
-
-
ASP sells one I believeOriginally posted by warbeak2099Will you be offering a pre-tapped VA? AGD does not currently offer a VA with a front port, just side ports.Comment
-
After the LPR upgrade is released I would be happy to drill peoples ASA's (if it can be done) for them if they cover shipping. I enjoy working in my home shop.
Comment
-
-
Comment
-
I guess I'm one of very few left who don't like seeing new markers without safety features. I didn't have one on my electro, but it's easy to turn the frame off. I guess gas-off will be my safety, but that means I definitely have to pick up a nice on/off ASA so I can do that easily.
Garf, I think what people are looking for with the LPR and ASA is a package deal that comes with the LPR in the frame and the ASA bolted on and drilled. I think I speak for most of us when I say I don't really care what on/off ASA I have, so long as it holds gas and turns on and off easily.
If we have to drill our own ASAs, is this doable with a handheld power drill with the proper bit or no? I think one of the best things about a production frame is that you don't have to send your frame away to get work done or figure out how to do it yourself.
Comment
-
I believe the air bleed type of on/off ASA are the best way of making the Mag safe when off the field and not in use. The traditional on/off ASA tend to blow orings easily.
We are not in the business of making on/off ASA, although it is required for an internal LPR setup. The ASA needs a single hole drilled and a possible adaptor depending on the ASA used to get air into the frame.
"Pneumagger " has offered his airsmith services to drill any ASA sent to him.
I think both CP and Newdesignz on/off ASA with the air bleed feature are patented products. Can someone confirm that?
Garf
Originally posted by ThePixelGuruI guess I'm one of very few left who don't like seeing new markers without safety features. I didn't have one on my electro, but it's easy to turn the frame off. I guess gas-off will be my safety, but that means I definitely have to pick up a nice on/off ASA so I can do that easily.
Garf, I think what people are looking for with the LPR and ASA is a package deal that comes with the LPR in the frame and the ASA bolted on and drilled. I think I speak for most of us when I say I don't really care what on/off ASA I have, so long as it holds gas and turns on and off easily.
If we have to drill our own ASAs, is this doable with a handheld power drill with the proper bit or no? I think one of the best things about a production frame is that you don't have to send your frame away to get work done or figure out how to do it yourself.

Comment
-
Good question. The second run is a projected date. So don't bank on it.
The first run is confirmed.
Originally posted by lukeAre you certain there will be a second run?Comment
-
Internal Micro-LPR can now be ordered!
The G-Force Internal Micro-LPR can now be ordered on our webstore.
If you order the Internal Micro-LPR at the same time with our frame, it can be factory installed before shipping upon your request.
Again, the production run for this item is even more limited since we expect most people will consider the external LPR route.
You will need your on/off ASA modified to supply air to the bottom of the frame.
Expected delivery timeframe is end of Dec 2007. There is no second production run as of today.
GarfLast edited by G-Force Tech; 10-11-2007, 02:31 PM.Comment
-
Now thats what I'm talking about !Originally posted by G-Force TechThe G-Force Internal Micro-LPR can now be ordered on our webstore.
If you order the Internal Micro-LPR at the same time with our frame, it can be factory installed before shipping upon your request.
Again, the production run for this item is even more limited since we expect most people will consider the external LPR route.
You will need your on/off ASA modified to supply air to the bottom of the frame.
Expected delivery timeframe is end of Dec 2007. There is no second production run as of today.
Garf
The whole schemeel.
Can we send a direct mount CP bottom line asa (just like you have on the marker in your pics) to you and have you drill it and mount it ?
Some people were born all thumbs you know.

Comment






Comment