OK, we're back on track!
I lost two weeks on the feedcup prototyping due to waiting on replacement tooling on two tool orders. The new feedcup design panned out so everyone that ordered bodies will be getting a free feedtube assembly.
The new design works with large and small hopper necks.
I will be starting production on the feedcups and brass barrel nuts tomorrow. As soon as the runs are done I'll start the Deflator machining.
We are getting close to wrapping this up.




By the way, production bodies will not have that extra line above the side milling.
I lost two weeks on the feedcup prototyping due to waiting on replacement tooling on two tool orders. The new feedcup design panned out so everyone that ordered bodies will be getting a free feedtube assembly.
The new design works with large and small hopper necks.
I will be starting production on the feedcups and brass barrel nuts tomorrow. As soon as the runs are done I'll start the Deflator machining.
We are getting close to wrapping this up.




By the way, production bodies will not have that extra line above the side milling.