Predator II Board - Authorized Install Center

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • BigEvil
    www.BigEvilOnline.com

    • Feb 2005
    • 9333

    #196
    Originally posted by CoolHand
    They had a setback on the next gen Pred Morlocks, so we just have to wait it out.
    I was wondering what was up with the one I ordered. What kind of delay? Im curious.

    Comment

    • CoolHand
      Logic Industries LLC
      • Jan 2003
      • 3769

      #197
      Originally posted by BigEvil
      I was wondering what was up with the one I ordered. What kind of delay? Im curious.
      They're out of them, I'm out of them, and the next batch got pushed back until after Chicago PSP.

      I have them on order, but they pushed the delivery date back from this week to after Chicago in order to finish up a project that needed to be unveiled at the PSP. Dunno what it is exactly, but that is what is going on right now.

      No one has any, I've looked, so all we can do is wait it out. Bob said that they would be forthcoming as soon as Chicago was over.

      Incidentally, this may be what is holding up Chris with the Devil Mags. No boards = No Boom Boom.
      Ryan Shanks
      Logic Industries LLC

      Comment

      • Temujin
        Photographer
        • Aug 2004
        • 112

        #198
        Red X-Mag

        He's still en route. He just left yesterday and he won't arrive in Miami for another 7 days. Let me know when you're ready to send out and I'll let you know whether you'll send it to me or him in Miami.

        Originally posted by CoolHand
        Mike - TAG had trouble with the XMag, so it is coming back to me to be finished up (its not their fault, they don't deal with them at all). The board is fixed though, its just a matter of making sure all the wires are run correctly (I think the HES harness got turned around backwards when I was trying to trouble shoot the dead board before). At any rate, I can ship it to him in Florida if we don't make it.

        Duzzy - Its just fine, lounging by the pool, waiting on the board and eye covers. I haven't even touched it yet, as I wanted to make sure I could get covers for the eyes before I cut on it any at all. It looks like I'll be able to get them in two or three weeks though. Once I have covers secured, I will do the machine work, and then it will just be down to Bob getting me a dual 'noid Pred. They had a setback on the next gen Pred Morlocks, so we just have to wait it out.

        Comment

        • CoolHand
          Logic Industries LLC
          • Jan 2003
          • 3769

          #199
          Originally posted by Temujin
          He's still en route. He just left yesterday and he won't arrive in Miami for another 7 days. Let me know when you're ready to send out and I'll let you know whether you'll send it to me or him in Miami.

          Will do.
          Ryan Shanks
          Logic Industries LLC

          Comment

          • Duzzy
            Mentally confused, wanders

            • Apr 2004
            • 940

            #200
            Cool, thanks for the update and your patience. But the marker is a little sensitive to the sun, it is prone to redness. So make sure it isn't out too long. Thanks.

            My Feedback
            (It's a work in progress)

            Comment

            • Temujin
              Photographer
              • Aug 2004
              • 112

              #201
              Send it to me in Los Angeles...

              Talked to my brother. He's still en route to Florida, but he said to send it to me, so I test fire it and look it over before forwarding it to him. He's never had a chance to try out my E-Tac, so he'd prefer I tweak the settings to where he wants it before he gets it.

              What's the ETA for completion? Do you still need my mailing address? I'm leaving for New York for 7 days starting Friday night, so let me know when you're planning to send it out and I'll let you know, whether you'll be sending to my home or work. Thanks.

              Originally posted by CoolHand
              Will do.

              Comment

              • Duzzy
                Mentally confused, wanders

                • Apr 2004
                • 940

                #202
                Any news on the home front yet? BTW, JMJ does eye covers for Excals and Vikings. Thanks.

                My Feedback
                (It's a work in progress)

                Comment

                • CoolHand
                  Logic Industries LLC
                  • Jan 2003
                  • 3769

                  #203
                  Originally posted by Duzzy
                  Any news on the home front yet? BTW, JMJ does eye covers for Excals and Vikings. Thanks.
                  Still waiting on the board. Bob said that it would be one of the first of the new platform, with all the new code as well. They just aren't done yet.

                  I already got the covers from JMJ. There is a set of black ones living in the box with your Excal as of right now.
                  Ryan Shanks
                  Logic Industries LLC

                  Comment

                  • Duzzy
                    Mentally confused, wanders

                    • Apr 2004
                    • 940

                    #204
                    Cool, I only mentioned the covers because you said in your previous post that you were looking for some. I didn't realize it was over a month ago... Anyways, sounds good, do I owe you anything else for the covers? I would prefer a "no" but let me know if you do. Thanks.

                    Originally posted by CoolHand
                    Still waiting on the board. Bob said that it would be one of the first of the new platform, with all the new code as well. They just aren't done yet.

                    I already got the covers from JMJ. There is a set of black ones living in the box with your Excal as of right now.

                    My Feedback
                    (It's a work in progress)

                    Comment

                    • CoolHand
                      Logic Industries LLC
                      • Jan 2003
                      • 3769

                      #205
                      Originally posted by Duzzy
                      Cool, I only mentioned the covers because you said in your previous post that you were looking for some. I didn't realize it was over a month ago... Anyways, sounds good, do I owe you anything else for the covers? I would prefer a "no" but let me know if you do. Thanks.
                      I think you paid $350, right?

                      If so, then the covers are extra. The damned things cost $55, but you gotta have them.

                      Don't worry about money yet. I'll get you a bill when its done, you've paid more than enough to get started. We'll settle up when its finished.

                      Ryan Shanks
                      Logic Industries LLC

                      Comment

                      • Duzzy
                        Mentally confused, wanders

                        • Apr 2004
                        • 940

                        #206
                        Ouch... Take your time with the bill if it helps... Anyways, a week or so HU would be nice so I don't get got when my wallet is fasting. Thanks.

                        Originally posted by CoolHand
                        I think you paid $350, right?

                        If so, then the covers are extra. The damned things cost $55, but you gotta have them.

                        Don't worry about money yet. I'll get you a bill when its done, you've paid more than enough to get started. We'll settle up when its finished.


                        My Feedback
                        (It's a work in progress)

                        Comment

                        • CoolHand
                          Logic Industries LLC
                          • Jan 2003
                          • 3769

                          #207
                          Originally posted by Duzzy
                          Ouch... Take your time with the bill if it helps... Anyways, a week or so HU would be nice so I don't get got when my wallet is fasting. Thanks.
                          I'd say you have a good month at least yet. I haven't done the machine work yet, because I don't have a board yet (and I don't want to cut on it until I am sure its a done deal, just to be safe, plus I'm busy as hell, and this is a project I know for sure that I can't finish right now).

                          I will let you know when the board is done. That should give you two weeks for sure, though I don't foresee any other extra charges right now.
                          Ryan Shanks
                          Logic Industries LLC

                          Comment

                          • Rembrandt
                            Blackhearts Team Medic
                            • Aug 2004
                            • 293

                            #208
                            Any chance you know how long before the new boards are out? I'm really interested in getting a DIY kit. Thanks

                            Comment

                            • CoolHand
                              Logic Industries LLC
                              • Jan 2003
                              • 3769

                              #209
                              Originally posted by Rembrandt
                              Any chance you know how long before the new boards are out? I'm really interested in getting a DIY kit. Thanks
                              Last I heard from TAG they said "After the Chicago PSP".

                              Well, its after, but no more news.

                              I'd say check back in two weeks.
                              Ryan Shanks
                              Logic Industries LLC

                              Comment

                              • Temujin
                                Photographer
                                • Aug 2004
                                • 112

                                #210
                                Received the Red X-Mag

                                I received the Red X-Mag Friday, but you didn't give me details of what I'm supposed to do about installing the ACE Board since it still isn't operational. You mentioned some soldering or cutting??

                                Comment

                                Working...